
Saturday, August 08, 2026
West Coast, Best Coast

Thursday, August 06, 2026
Our City Opens Up More Waterfront
After years of construction dust right outside our front door, the westward extension of Westminster Pier Park officially opened yesterday. The city and Bosa replaced that bleak old surface parking lot with two acres of proper green space, capping the underground parkade and seamlessly connecting Pier Park straight through to the Quayside Esplanade at last.
It is a well-designed stretch of riverfront. Beyond the open lawns and new trees, there is a central festival plaza with splash jets, a shaded stage, and a striking Coast Salish art installation titled Ebb and Flow. They even managed to squeeze in an outdoor gym, ping pong tables, and a dedicated dog relief area.
The community turned out this afternoon. Families milled around a food truck, kids invaded the water jets, and a few brave souls tested out a cold plunge setup by the boardwalk. The formal speeches and ribbon cutting wrapped up around 19:00, leaving live acoustic music to drift over the Fraser as the sun dipped. It is a genuine, long-overdue upgrade to our city's connection to the Fraser River.
Wednesday, July 15, 2026
Reclaiming the Waterfront

A Walk Through the Westward Expansion
With Jay over at the Bonsor Recreation Gym in Burnaby this morning, I headed down to the river around 10:30, phone in hand, to see how the city is doing with clawing back our waterfront from its old, creosote-soaked industrial past. The new westward expansion is finally hooking up the old pier park with the River Market; standing right under those massive Bosa towers, it is a funny contrast, seeing all that looming glass sitting right next to a fresh public greenway.
I wandered through Phase 1, which has been open to everyone since May. The city has crammed all sorts of things into these little "outdoor rooms," including a shiny new fitness circuit, ping-pong tables, and some nice, tiered wooden decks.
Past the art, a chain-link still fences off Phase 2 and lets one know they are not quite finished. Peeking through the wire, I watched the crew working on the new concrete seating plinth and performance stage, which is a multi-tiered setup meant for casual river-watching or live acts once they finally open the central plaza. The rest of it, the spray park, the stage, and the dog zone, is all taking shape behind the barricades. Even the big play tower by the Sixth Street overpass is still locked tight while they hook up the plumbing for the new washrooms. Still, watching them work under the warm morning sun, you can tell the whole boardwalk is finally coming together.

Saturday, May 09, 2026
Public Space Along the Riverfront

Friday, April 17, 2026
Saving the Ordinary
Wednesday, October 15, 2025
It's Been a Great Run of Good Weather
Wednesday, August 27, 2025
It's Progressing Even If Slowly ...


Friday, July 04, 2025
Reconnecting to the Fraser
Downtown New Westminster is finally getting back access to some of the Waterfront. For years, the construction of the two high-rise buildings prevented access between Pier Park and the New Westminster Quay.

Wednesday, April 23, 2025
Changes in Construction Techniques

Wednesday, April 02, 2025
Pier West
Sunday, October 06, 2024
A Closer Look at the Pier West Towers
Tuesday, April 16, 2024
In Our Neighbourhood
Thursday, September 21, 2023
The Progress on the Buildings
Sunday, August 27, 2023
'Farewell to Summer' Fireworks Festival 2023
Thursday, June 29, 2023
A Day at Home Again
Wednesday, May 24, 2023
Places for Lots of New Neighbours

Friday, April 21, 2023
Along the New Westminster Riverfront

Wednesday, April 12, 2023
New Residential Towers
Wednesday, April 05, 2023
'Pier West' Development in New Westminster, BC
























