I realized that the pedestrian overpass to Pier Park definitely missed a summer completion. I really don't know when it was supposed to be finished, so maybe the construction is right on target. I did notice that a batch of clear glass arrived, apparently for the elevator enclosure.
Having the pedestrian walkway will make our river-side park so much more accessible for us. I look forward to its opening. As we still have not pinned down any specific plans for this winter yet, it could be opened before we escape to a sunny location.